To: Facilities

This is a list of the current projects and problems in the Academic Technologies areas.   
Please let me know if you  need additional information for any of these items.  
Thanks!  Mary Ellen     
mtucker@barnard.edu
   x 4-6933      Room 206 Lehman  (Library, second floor, north end)

 

Location 

Category 

Details 

First reported 

Status 

Lehman Computer Lab, 
West Wing

carpentry

Permanent, strong door stop needed to prevent door (between West Wing and Reading Room) from hitting the electrical wiring on the adjacent wall.  This seems to be a safety issue.  There was a problem with the power in this room earlier this semester.

03/19/04

 

reminder
04/02/04

Lehman Computer Lab,  South Wing

carpentry

Install new coat rack.   Needs to be attached to wall with screws.

09/14/04

 

Lehman Computer Lab, Consultant Desk

carpentry

Small cabinet to be assembled

09/14/04

 

Elliott lobby

lock

There is a wooden cabinet in the lobby which holds two computers. Please drill out the lock on this cabinet.    Do not replace the lock.  Please notify me (x4-6933) when this is done. 

02/20/03

Done 02/26/03
Thank you.

Lehman 11

painting

A large reception desk was removed from the central room earlier this semester.  It was previously attached to the wall.  This area now needs to be patched and painted.        

02/20/03

Done 03/05/03
Thank you.

Lehman , Hallway outside of 11

trash

There are about 9 boxes (labeled "trash") to be discarded.  We have no use for these metal frames.

02/26/03

Done 03/12/03
Thank you

Lehman 11, room D (the small lab)

carpenter

Please raise the height of the closet rod so that it is 70 inches from the floor.

02/20/03

Done 03/24/03
Thank you

Labs

cleaning

Wash carpets, clean upholstered chairs in the computer labs

07/09/03

Done 08/10/03
Thanks. 

Lehman 11

cleaning

A large reception desk was removed from the central room earlier this semester.  The tile floor has a thick residue of wax (etc.) and needs special cleaning.

02/20/03

Done  02/27/03
Thank you.

Lehman 11 

HVAC 

Compressor has failed.
03/06: Patrick reports new compressor ordered

03/06/03

Done  03/15/03
Thank you.

Milbank, 333

key

Need copy of Master key that opens  Math Help Room and Math Computer Lab, 333 Milbank

07/08/03

Done  07/15/03
Thanks!  

Lehman 11

Lights

Need replacement bulbs in ceiling lights
If there are two fluorescent tubes in one "panel", then we need 5 bulbs.  Two panels are out completely  and one panel is out on one side.

02/27/04

done
03/20/04
Thank you.

Lehman Computer Lab

electrical

Need  install a new networked printer in the north office.  Need  a review of the outlets in that room. We need to avoid sharing power between the printer and the computers.  
Vladimir recommends installation of a new line.  This request sent 2/10/04

02/05/04

Done
2/16/04
Thank you.

Lehman 22

Keys

Room 22 Lehman has been assigned to my department, Academic Technologies, for the summer. We will use this room through Friday, August 1 to store computer hardware.   Please change the lock to an "off-master" key and make five copies of the key. 

05/03/03

Done
6/10/03
Thank you. 

Lehman Computer Lab

carpentry

Request for  estimate of the cost of building a wall in the Lehman Computer Center to create a larger secure workspace for the technicians.  We would like to build an east-west wall in the Lehman Computer Center.  The newly created workspace at the south end of the lab would allow technicians to set up an efficient installation and repair center.  This wall, with large glass panels and a door, would provide security for the equipment and would protect the users of the computer lab from the noise of consultations and phone calls to  Dell and other vendors.

02/15/04

Done
August 2004 Thank you.

Lehman 11

carpet

We are interested in carpeting this central room which is approximately 20' x 8', and the small computer lab (on the right as you walk in).   We are fairly open-minded about exact color.   

02/20/03

Done
July 2004
Thank you.

Lehman 11

mechanic

I would like to discuss ripping out
* the old network jacks in the TLC area.
* the old shelf brackets in all rooms

03/06/03

Done
July 2004
Thank you.

Lehman 11

quote

The door to the hallway should have a large window (nearly all glass).  Who can advise us about this?

03/25/03

Done
July 2004
Thank you.

Lehman 11

carpentry

Please remove the cabinets in the small computer lab (Inner room, to the right as you enter).  We will empty the cabinets when you are ready to start. After the cabinets are removed, we will need carpeting in this room and the central area.

10/13/03

Done
July 2004
Thank you.

Lehman 11

painting

Painting the walls and ceiling in this area?

02/25/04

Done
July 2004
Thank you.

Lehman  10

vents

The air vents in this room have been covered with duct tape.  Do you know why this was done?
Notes: 2/27: Walter says to improve cooling  BEATL.  
2/28:  This is a problem for us.  We will investigate alternatives.

02/20/03

ON HOLD:  No action required by Facilities now

 


Last update  09/15/04

 AT reports problems to   facilties@barnard.edu