ACCESSIBILITY/GETTING
AROUND CAMPUS
Campus Re-routing
The construction wall is up.
The entrance to the campus link/tunnel from the 119th Street and Claremont gate is open and should remain open for the duration of construction.
There is no on-campus path between the north and south ends of campus. Please use the campus link or Claremont Avenue.
The 119th street and Broadway gate is closed. Students, faculty and staff may access Milbank Hall on 120th via swipe card.
Accessibility
During demolition and construction, we will be working to continue to provide wheelchair accessibility throughout the Barnard campus. Special attention will be given to the campus’s north end, the location of the Nexus. The tunnel system, which at the basement-floor level connects all buildings on campus, may be temporarily blocked in certain locations. We will post and date access signage with alternate accessible routes as necessary.
We will also include accessibility information within the regular updates posted on the Construction Logistics page on the Nexus website.
The Nexus has been designed to be in compliance with all locally mandated code requirements and with the Americans with Disabilities Act of 1990 (ADA). Both Facilities Services Director Julio Vazquez and Disability Services Director Susan Quinby meet on a regular basis to discuss Nexus/access issues and concerns.
Your comments or questions are welcomed.
Contact information by e-mail or telephone:
jvazquez@barnard.edu or 212-854-2041;
squinby@barnard.edu or 212-854-4634 (voice/TTY).
The information provided here reflects the current status of the Nexus project and the most up-to-date plans for the future. It cannot cover all contingencies. Please check this site periodically to see if new information has been posted.



